0

Case Studies

Ports of Jersey

CLIENT: Ports of Jersey, Jersey Ferry Terminal

SOLUTION: GTI Max

In 2017 Ports of Jersey announced a progressive plan to create an integrated arrivals and departures terminal at Elizabeth terminal.

Working with Gerflor Flooring Group, Flawless Flooring helped carry out a major works programme that would see an extension to the existing departures terminal building with the construction of a mezzanine floor to create a new central security search area and airside departures lounge.

Flawless Flooring were on hand to supply a high-quality, fast track flooring that would provide a quick and effective solution with no need for any shutdown of the terminal.

//flooring.je/wp-content/uploads/2021/02/ports-insert.jpg

"Gerflor’s GTI Max flooring was the only way to go. It looks amazing, and has completely transformed the terminal. The area now looks smart, bright and very welcoming."

Maria Le Tiec

Passenger Services Manager for Ports of Jersey

//flooring.je/wp-content/uploads/2021/02/poj-1.jpg
//flooring.je/wp-content/uploads/2021/02/poj-2.jpg
//flooring.je/wp-content/uploads/2021/02/poj-3.jpg